Case Studies : Sir John Cass C of E School
A double storey education facility, with attractive external claddings.

Project:  6th Form Classroom Block

Location:  Tower Hamlets, London

Contract Duration: Sale

Number of Modules: 42

Overall Floor Area: 1400m2


The new 2-storey high specification education facility houses 4 classrooms, a library and a Business and Enterprise Centre which is a resource used by both students and the local community. The exterior cladding is brick slip with elements of timber cladding to match existing buildings and it has a pitched roof.


The plans for the building had already been approved prior to the order being placed, therefore the Waco UK team needed to design the modules to meet the predetermined layout.  As principal contractor, Waco UK provided a full turnkey package and all groundworks, mains services, manufacture, fit out, delivery and installation of the modules were completed within a 26 week timeframe, ready for the start of the new academic year.

Phase 2: 6th form block. 22 Bays, 998m2
Lab room and further classrooms, including data points for laptops. 6th form class room facility but also used for Adult Education.   Needed to adhere to strict planning regulations from Local Authority who would only approve building construction if same as existing building.



Additional Images
2 storey brick & timber clad classrooms 2-storey brick & timber clad classrooms 2-storey brick & timber clad classrooms 2-storey brick & timber clad classrooms
2-storey brick & timber clad classrooms 2-storey brick & timber clad classrooms 2-storey brick & timber clad classrooms 2-storey brick & timber clad classrooms
2-storey brick & timber clad classrooms 2-storey brick & timber clad classrooms 2-storey brick & timber clad classrooms 2-storey brick & timber clad classrooms
2-storey brick & timber clad classrooms
0800 316 0888
We are proud members of the WACO Group
Click here to register
Logos
Waco Logo
Website Solution By Strawberry, Web Design Hull
W3C CSS W3C XHTML