PremierPC Explained
Following the success of our prison cell product (PremierCell), which received MoJ approval for Category C & B prisons,  Premier Interlink have developed a new product – the PremierPC.

It's a cost effective, steel framed, permanent building solution for adding police custody suites and Bridewell units required by Police Authorities. The PremierPC is manufactured using modern off-site construction methods.

  • Off-site construction significantly speeds up the time of a new building from order to completion. 
  • Our robust, steel-framed, permanent buildings are manufactured off-site.  Internal fixtures - doors, walls, plumbing & electrics, furniture, decoration, etc are fitted off-site, whilst the construction site is being prepared.
  •  The buildings are delivered to site for 75 – 90% complete. Depending on the size of the building, construction and fitting out on site can take between 4 and 20 weeks,  causing minimum disruption to site, and saving time. 
  • It offers the peace if mind of knowing and managing costs and timescales for your new building.

These steel framed units are built in line with Home Office guidelines as a permanent solution to police cell capacity constraints.

  • Designed and built using modern methods of construction
  • Lambeth cell layout
  • Concrete floor option for noise absorption
  • Individual, separating walls for less noise disruption
  • Solid surface finish
  • Choice of furnishings and finishes to suit individual requirements